pelagia-portal/App/lib
Hardik 3edd1ffcc5
All checks were successful
PR checks / checks (pull_request) Successful in 43s
PR checks / integration (pull_request) Successful in 31s
feat(po): email PO to vendor — PDF link in an Outlook draft (#14)
Adds an "Email to vendor" button on the PO detail (available once approved,
through CLOSED, and again after payment) that opens an Outlook draft addressed
to the vendor's primary contact with a time-limited PDF download link.

Since mailto: can't attach files, the PDF is rendered and stored, and the draft
carries a link (the approach chosen for this issue):

- PdfService/: new standalone Express + Playwright microservice (GstService/
  EpfoService pattern) — POST /pdf { url } renders a page to a real PDF via
  headless Chromium. SSRF-guarded (shared token + optional origin allowlist).
- export route: accepts a server-only `svc` token (PDF_SERVICE_TOKEN) so
  PdfService can fetch /api/po/[id]/export?format=pdf without a user session;
  `pdf=1` drops the print button + window.print() auto-trigger.
- lib/pdf-service.ts renderPoPdf(); prepareVendorEmail() server action renders →
  uploads to R2 (po-pdf/…) → presigns a 7-day link → returns a mailto draft.
- po-detail: EmailVendorButton, shown when approved + vendor has a contact email.
- Gated by PDF_SERVICE_URL/PDF_SERVICE_TOKEN; friendly error if unconfigured.
- No DB model/migration. Tests: prepareVendorEmail (6, PdfService/storage mocked).

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-24 02:45:48 +05:30
..
validations feat(po): allow submitter to set an optional PO date 2026-06-16 13:06:12 +05:30
application-pipeline.ts feat(crewing): Phase 3b — recruitment pipeline (flagged) 2026-06-22 18:49:12 +05:30
appraisal-state-machine.ts feat(crewing): Phase 5b — appraisal (flagged) 2026-06-22 22:09:32 +05:30
attachments.ts fix(po): show all attachments grouped by type on PO details 2026-06-19 04:43:44 +05:30
cancelled-watermark.ts fix(po): size XLSX export images by pixels (aspect preserved) 2026-06-21 13:27:15 +05:30
cart.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
cost-centre-groups.ts refactor: revert cost centre to vessels only, remove vessel-site link 2026-05-30 18:14:24 +05:30
crew-login.ts feat(crewing): resolve self-contained deferred follow-ups (flagged) 2026-06-22 22:28:23 +05:30
crew-pii.ts fix(crewing): mask Aadhaar/PAN document numbers server-side 2026-06-22 23:29:11 +05:30
db.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
employee-number.ts feat(crewing): Phase 3c — onboarding (flagged) 2026-06-22 19:12:53 +05:30
feature-flags.ts feat(crewing): foundations — SITE_STAFF role, ranks reference data + admin (flagged) 2026-06-22 13:26:04 +05:30
forgejo.ts feat(automation): issue-to-deploy pipeline — Report Issue button, Claude watcher, tag-triggered deploy 2026-06-11 16:39:43 +05:30
geo.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
id-generators.ts feat(crewing): foundations — SITE_STAFF role, ranks reference data + admin (flagged) 2026-06-22 13:26:04 +05:30
image-size.ts fix(po): size XLSX export images by pixels (aspect preserved) 2026-06-21 13:27:15 +05:30
leave-clash.ts feat(crewing): clash detection by required strength (Option A) 2026-06-22 21:14:21 +05:30
notifier.ts feat(crewing): Phase 5b — appraisal (flagged) 2026-06-22 22:09:32 +05:30
pdf-service.ts feat(po): email PO to vendor — PDF link in an Outlook draft (#14) 2026-06-24 02:45:48 +05:30
permissions.ts feat(crewing): admin crew management — direct placement, CRUD, strength config 2026-06-22 21:23:31 +05:30
po-export-layout.ts fix(po): keep the export stamp clear of the signature (no overlap) 2026-06-21 15:35:09 +05:30
po-import-parser.ts feat: structured PO numbers, import closed, auto-vendor/product, company code, inventory flag 2026-05-31 01:56:33 +05:30
po-number.ts fix(po-number): floor at 9000, imported POs keep original PO number 2026-05-31 02:33:42 +05:30
po-state-machine.ts feat(po): cancel POs (manager/superuser) + optional supersede link (#53) 2026-06-21 12:20:54 +05:30
requisition-number.ts feat(crewing): Phase 2 — requisitions + relief requests (flagged) 2026-06-22 18:22:59 +05:30
requisition-service.ts refactor(crewing): correct audit action types + atomic auto-raise backfills 2026-06-22 23:46:23 +05:30
requisition-state-machine.ts feat(crewing): Phase 2 — requisitions + relief requests (flagged) 2026-06-22 18:22:59 +05:30
storage.ts feat(po): email PO to vendor — PDF link in an Outlook draft (#14) 2026-06-24 02:45:48 +05:30
upload-files.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
utils.ts feat(po): cancel POs (manager/superuser) + optional supersede link (#53) 2026-06-21 12:20:54 +05:30