pelagia-portal/App/lib
Hardik aac31c6755 feat(crewing): Phase 4b — leave & attendance (flagged)
Second slice of Phase 4 (stacked on 4a crew records). Leave (site-applied,
Manager-decided) with clash auto-backfill, and the daily attendance calendar,
per Crewing-Implementation-Spec §5.3/§8.9–8.10. Behind NEXT_PUBLIC_CREWING_ENABLED.

What's in
- Schema (crewing_leave_attendance migration): LeaveRequest (LeaveType,
  LeaveStatus) + Attendance (AttendanceStatus, unique per assignment+date) on
  CrewAssignment; CrewActionType += LEAVE_APPLIED/LEAVE_DECIDED/ATTENDANCE_RECORDED.
- Leave (R1): site staff apply on behalf (apply_leave); Manager decides
  (decide_leave) → assignment ON_LEAVE; MPO has no leave role. Leave approvals also
  surface in the central /approvals queue (§8.13 Leave kind). Notification
  LEAVE_FOR_APPROVAL.
- Clash auto-backfill (R6): lib/leave-clash.ts, required strength = 1 — approving a
  leave that leaves the vessel with zero active same-rank cover auto-raises a LEAVE
  requisition via the Phase-2 autoRaiseRequisition.
- Attendance (R5): daily month calendar; site staff record (record_attendance),
  Manager views (view_attendance) but cannot edit, MPO neither. saveAttendance
  bulk-upserts dirty cells.
- Screens: /crewing/leave (apply-on-behalf + Manager Approve/Decline) and
  /crewing/attendance (tap-to-cycle calendar + Save). Leave + Attendance added to
  the flag-gated nav (Manager + Site staff).

Tests & docs
- Integration: leave-attendance.test.ts (7) — apply/decide, clash auto-raise (and
  no-raise when cover remains), MPO/Manager attendance lockout, permission gating.
  type-check clean; full unit (240) + integration (182) green.
- CLAUDE.md updated with the Phase 4b surface.

Deferred: the 6-month leave-planner timeline (lightweight list for now); hours/
overtime attendance (A7).

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-22 21:07:15 +05:30
..
validations feat(po): allow submitter to set an optional PO date 2026-06-16 13:06:12 +05:30
application-pipeline.ts feat(crewing): Phase 3b — recruitment pipeline (flagged) 2026-06-22 18:49:12 +05:30
attachments.ts fix(po): show all attachments grouped by type on PO details 2026-06-19 04:43:44 +05:30
cancelled-watermark.ts fix(po): size XLSX export images by pixels (aspect preserved) 2026-06-21 13:27:15 +05:30
cart.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
cost-centre-groups.ts refactor: revert cost centre to vessels only, remove vessel-site link 2026-05-30 18:14:24 +05:30
crew-pii.ts feat(crewing): Phase 4a — crew records & profile + PPE (flagged) 2026-06-22 19:27:21 +05:30
db.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
employee-number.ts feat(crewing): Phase 3c — onboarding (flagged) 2026-06-22 19:12:53 +05:30
feature-flags.ts feat(crewing): foundations — SITE_STAFF role, ranks reference data + admin (flagged) 2026-06-22 13:26:04 +05:30
forgejo.ts feat(automation): issue-to-deploy pipeline — Report Issue button, Claude watcher, tag-triggered deploy 2026-06-11 16:39:43 +05:30
geo.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
id-generators.ts feat(crewing): foundations — SITE_STAFF role, ranks reference data + admin (flagged) 2026-06-22 13:26:04 +05:30
image-size.ts fix(po): size XLSX export images by pixels (aspect preserved) 2026-06-21 13:27:15 +05:30
leave-clash.ts feat(crewing): Phase 4b — leave & attendance (flagged) 2026-06-22 21:07:15 +05:30
notifier.ts feat(crewing): Phase 4b — leave & attendance (flagged) 2026-06-22 21:07:15 +05:30
permissions.ts feat(crewing): foundations — SITE_STAFF role, ranks reference data + admin (flagged) 2026-06-22 13:26:04 +05:30
po-export-layout.ts fix(po): keep the export stamp clear of the signature (no overlap) 2026-06-21 15:35:09 +05:30
po-import-parser.ts feat: structured PO numbers, import closed, auto-vendor/product, company code, inventory flag 2026-05-31 01:56:33 +05:30
po-number.ts fix(po-number): floor at 9000, imported POs keep original PO number 2026-05-31 02:33:42 +05:30
po-state-machine.ts feat(po): cancel POs (manager/superuser) + optional supersede link (#53) 2026-06-21 12:20:54 +05:30
requisition-number.ts feat(crewing): Phase 2 — requisitions + relief requests (flagged) 2026-06-22 18:22:59 +05:30
requisition-service.ts feat(crewing): Phase 3b — recruitment pipeline (flagged) 2026-06-22 18:49:12 +05:30
requisition-state-machine.ts feat(crewing): Phase 2 — requisitions + relief requests (flagged) 2026-06-22 18:22:59 +05:30
storage.ts feat(crewing): Phase 3a — candidates / talent pool (flagged) 2026-06-22 18:23:01 +05:30
upload-files.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30