pelagia-portal/App/lib
Hardik bb5f4126b0
All checks were successful
PR checks / checks (pull_request) Successful in 39s
PR checks / integration (pull_request) Successful in 28s
feat(crewing): admin crew management — direct placement, CRUD, strength config
Office/admin crewing-management surface behind a new manage_crew permission
(Manager + SuperUser + Admin). Stacks on 4b. Behind NEXT_PUBLIC_CREWING_ENABLED.

What's in
- Permission: manage_crew added to the §6 matrix (MGR/SU/ADMIN).
- Direct placement (placeCrew): a Manager assigns a crew member to a vessel/site
  WITHOUT a requisition — creates an ACTIVE CrewAssignment, promotes a candidate to
  EMPLOYEE with a CRW- number (generateEmployeeId), blocked if already actively
  assigned.
- Admin crew CRUD: createCrewMember / updateCrewMember / deleteCrewMember (delete
  blocked when assignments/applications exist).
- Crew strength config: upsert/delete VesselRankRequirement (the minStrength that
  drives R6 leave-clash detection).
- Screens under Administration (flag-gated, MGR/SU/ADMIN): /admin/crew (list + add/
  edit/delete + Place modal) and /admin/crew-strength (requirement table + form).

Tests & docs
- Unit: permissions-crewing.test.ts gains a manage_crew check. Integration:
  crewing-admin.test.ts (9) — CRUD, delete guard, direct placement (+promotion,
  +active-assignment guard), strength upsert/delete, manage_crew gating.
  type-check clean; full unit (241) + integration (192) green.
- CLAUDE.md updated with the crewing-admin surface.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-22 21:23:31 +05:30
..
validations feat(po): allow submitter to set an optional PO date 2026-06-16 13:06:12 +05:30
application-pipeline.ts feat(crewing): Phase 3b — recruitment pipeline (flagged) 2026-06-22 18:49:12 +05:30
attachments.ts fix(po): show all attachments grouped by type on PO details 2026-06-19 04:43:44 +05:30
cancelled-watermark.ts fix(po): size XLSX export images by pixels (aspect preserved) 2026-06-21 13:27:15 +05:30
cart.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
cost-centre-groups.ts refactor: revert cost centre to vessels only, remove vessel-site link 2026-05-30 18:14:24 +05:30
crew-pii.ts feat(crewing): Phase 4a — crew records & profile + PPE (flagged) 2026-06-22 19:27:21 +05:30
db.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
employee-number.ts feat(crewing): Phase 3c — onboarding (flagged) 2026-06-22 19:12:53 +05:30
feature-flags.ts feat(crewing): foundations — SITE_STAFF role, ranks reference data + admin (flagged) 2026-06-22 13:26:04 +05:30
forgejo.ts feat(automation): issue-to-deploy pipeline — Report Issue button, Claude watcher, tag-triggered deploy 2026-06-11 16:39:43 +05:30
geo.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
id-generators.ts feat(crewing): foundations — SITE_STAFF role, ranks reference data + admin (flagged) 2026-06-22 13:26:04 +05:30
image-size.ts fix(po): size XLSX export images by pixels (aspect preserved) 2026-06-21 13:27:15 +05:30
leave-clash.ts feat(crewing): clash detection by required strength (Option A) 2026-06-22 21:14:21 +05:30
notifier.ts feat(crewing): Phase 4b — leave & attendance (flagged) 2026-06-22 21:07:15 +05:30
permissions.ts feat(crewing): admin crew management — direct placement, CRUD, strength config 2026-06-22 21:23:31 +05:30
po-export-layout.ts fix(po): keep the export stamp clear of the signature (no overlap) 2026-06-21 15:35:09 +05:30
po-import-parser.ts feat: structured PO numbers, import closed, auto-vendor/product, company code, inventory flag 2026-05-31 01:56:33 +05:30
po-number.ts fix(po-number): floor at 9000, imported POs keep original PO number 2026-05-31 02:33:42 +05:30
po-state-machine.ts feat(po): cancel POs (manager/superuser) + optional supersede link (#53) 2026-06-21 12:20:54 +05:30
requisition-number.ts feat(crewing): Phase 2 — requisitions + relief requests (flagged) 2026-06-22 18:22:59 +05:30
requisition-service.ts feat(crewing): Phase 3b — recruitment pipeline (flagged) 2026-06-22 18:49:12 +05:30
requisition-state-machine.ts feat(crewing): Phase 2 — requisitions + relief requests (flagged) 2026-06-22 18:22:59 +05:30
storage.ts feat(crewing): Phase 3a — candidates / talent pool (flagged) 2026-06-22 18:23:01 +05:30
upload-files.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
utils.ts feat(po): cancel POs (manager/superuser) + optional supersede link (#53) 2026-06-21 12:20:54 +05:30