Hardik 5764403f1c feat(po): user-defined T&C categories + dynamic PO terms editor (#11)
Reworks the T&C feature per review:
- categories are user-defined DATA, not a fixed enum — admins add new ones;
- ALL PO T&Cs are catalogued, incl. the previously-fixed boilerplate (seeded
  under a "General" category) and an "Others" bucket;
- the PO form is a dynamic editor: "+ Add term", pick a category, type/pick a
  clause.

- schema: TermsCategory (name/sortOrder/isActive) + TermsCondition (categoryId
  FK + text + isDefault + isActive). PurchaseOrder.terms Json snapshot. Migration
  seeds every standard line as a clause (named slots, the two fixed lines under
  General, empty Others); isDefault rows pre-fill new POs.
- admin /admin/terms: Add/Edit clause form's category is a combobox — typing a
  new name creates the category; isDefault checkbox.
- PO editor components/po/po-terms-editor.tsx: dynamic rows (category + clause
  comboboxes), used by new/edit/manager-edit forms; new POs pre-fill from
  getDefaultPoTerms, edits load po.terms or legacyPoTerms (old tc* + fixed lines).
- storage: PurchaseOrder.terms ([{category,text}]) supersedes tc* for export +
  detail; null on old POs falls back to tc* + fixed lines. parsePoTerms validates.
- export route + po-detail render from terms when present.
- tests rewritten for category creation + catalogue/default helpers.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-24 04:08:30 +05:30
..
validations feat(po): manager sets advance payment on approval (issue #92) 2026-06-24 01:40:20 +05:30
application-pipeline.ts feat(crewing): Phase 3b — recruitment pipeline (flagged) 2026-06-22 18:49:12 +05:30
appraisal-state-machine.ts feat(crewing): Phase 5b — appraisal (flagged) 2026-06-22 22:09:32 +05:30
attachments.ts fix(po): show all attachments grouped by type on PO details 2026-06-19 04:43:44 +05:30
cancelled-watermark.ts fix(po): size XLSX export images by pixels (aspect preserved) 2026-06-21 13:27:15 +05:30
cart.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
cost-centre-groups.ts refactor: revert cost centre to vessels only, remove vessel-site link 2026-05-30 18:14:24 +05:30
crew-login.ts feat(crewing): resolve self-contained deferred follow-ups (flagged) 2026-06-22 22:28:23 +05:30
crew-pii.ts fix(crewing): mask Aadhaar/PAN document numbers server-side 2026-06-22 23:29:11 +05:30
db.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
delivery-location.ts feat(po): admin-managed delivery locations + Place of Delivery dropdown (#19) 2026-06-24 02:08:59 +05:30
employee-number.ts feat(crewing): Phase 3c — onboarding (flagged) 2026-06-22 19:12:53 +05:30
feature-flags.ts Merge remote-tracking branch 'origin/master' into feat/submitter-view-all 2026-06-23 21:50:08 +05:30
forgejo.ts feat(automation): issue-to-deploy pipeline — Report Issue button, Claude watcher, tag-triggered deploy 2026-06-11 16:39:43 +05:30
geo.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
id-generators.ts feat(crewing): foundations — SITE_STAFF role, ranks reference data + admin (flagged) 2026-06-22 13:26:04 +05:30
image-size.ts fix(po): size XLSX export images by pixels (aspect preserved) 2026-06-21 13:27:15 +05:30
leave-clash.ts feat(crewing): clash detection by required strength (Option A) 2026-06-22 21:14:21 +05:30
notifier.ts feat(crewing): Phase 5b — appraisal (flagged) 2026-06-22 22:09:32 +05:30
pdf-service.ts feat(po): email PO to vendor — PDF link in an Outlook draft (#14) 2026-06-24 02:45:48 +05:30
permissions.ts feat(po): admin-managed Terms & Conditions catalogue + PO dropdowns (#11) 2026-06-24 03:38:32 +05:30
po-export-layout.ts fix(po): keep the export stamp clear of the signature (no overlap) 2026-06-21 15:35:09 +05:30
po-import-parser.ts feat: structured PO numbers, import closed, auto-vendor/product, company code, inventory flag 2026-05-31 01:56:33 +05:30
po-number.ts fix(po-number): floor at 9000, imported POs keep original PO number 2026-05-31 02:33:42 +05:30
po-state-machine.ts feat(po): cancel POs (manager/superuser) + optional supersede link (#53) 2026-06-21 12:20:54 +05:30
requisition-number.ts feat(crewing): Phase 2 — requisitions + relief requests (flagged) 2026-06-22 18:22:59 +05:30
requisition-service.ts refactor(crewing): correct audit action types + atomic auto-raise backfills 2026-06-22 23:46:23 +05:30
requisition-state-machine.ts feat(crewing): Phase 2 — requisitions + relief requests (flagged) 2026-06-22 18:22:59 +05:30
storage.ts feat(po): email PO to vendor — PDF link in an Outlook draft (#14) 2026-06-24 02:45:48 +05:30
terms-data.ts feat(po): user-defined T&C categories + dynamic PO terms editor (#11) 2026-06-24 04:08:30 +05:30
terms.ts feat(po): user-defined T&C categories + dynamic PO terms editor (#11) 2026-06-24 04:08:30 +05:30
upload-files.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
utils.ts feat(po): cancel POs (manager/superuser) + optional supersede link (#53) 2026-06-21 12:20:54 +05:30